by ABTECH | Aug 28, 2019 | News
Here are pictures of a recently completed bailer installation for Redball Recycling. The building had an existing 400 amp 208volt service so to save the Owner money we installed a step up transformer and wire to accommodate the 480 volt, 150 amp...
by ABTECH | Aug 22, 2019 | News
Gilford Johnson flooring hired Abtech Electric to upgrade some of their existing fixtures to LED in addition to adding a couple new fixtures. View the pictures below to see the after effects.
by ABTECH | Aug 13, 2019 | News
Abtech Electrical were happy to sponsor and play in the annual St. Anthony Men’s Club golf scramble.
by ABTECH | Aug 6, 2019 | News
Abtech Electrical was selected to provide the electrical services with long time partner Koetter Construction on the new Pharamcord office space at America Place. Enjoy the progress photos and can’t wait to reveal final pictures.